Welcome, visitor! [ Register | Login

£280.00

Beam of single scaffolding

  • Street: shanghai
  • City: shanghai
  • County: Aberdeenshire
  • Post Code: 200000
  • Phone Number: 86 21 67725455
  • Listed: January 27, 2012 2:22 am
  • Expires: This ad has expired

Description

First, building integrated mobile scaffolding outside the building floor by floor area calculated above. Building height refers to the design of the outdoor terrace to the eaves height (not including the parapet, roof water tanks, a canopy, height of the stairwell, etc.). Basement (semi-basement) scaffolding according to their gross floor area.

Second, full house cast reinforced concrete foundation strip width is greater than 3.0m of the base, can be calculated by full house foundation area based scaffolding, without deduction of the wall area occupied, or an additional transport channel based outside the area.

Third, can not be integrated scaffolding at construction area of the independent column, reinforced concrete walls and vacant single-beam, continuous beam of single scaffolding:

Fourth, reinforced concrete, brick parapet cornice back on the vertical height of more than 1.2m, and can also calculate scaffolding costs, apply the appropriate scaffolding double eaves height of the individual scale. Quantities by parapet (or back on) the length of the height multiplied by the area calculation.

Fifth, the level of protective frame, the horizontal projection of the actual area of decking.

Sixth, the vertical protective frames, the natural floor to the top layer between bar height multiplied by the actual erection erection length, area calculation.

Seven, in scaffolding at the vertical projection area of the wall.

Eight other structures of the scaffolding.

Nine, building by building vertical closed network perimeter length multiplied by the design of the outdoor terrace to the eaves height to floor area. Parapet or cornice height of more than 1.2m, and its height can be considered closed network to the top of the parapet wall or cornice. Add a bamboo vertical closed network scaffold board cvlf0rt, high increase of less than 30m bamboo scaffold board 0.30 m2, wire 0.07kg, 0.02 man-days labor, other mechanical charges 0.50 per 20m higher increase in the bamboo scaffold board another 0.009 m2, wire 0.002kg, 0.006 man-days labor, and other machinery costs 0.01 yuan.

Ten, adding layers of old buildings in floor construction scaffolding costs include comprehensive scaffolding, the external walls of old buildings double scaffolding. Plus a comprehensive scaffolding story building floor area by adding layer after layer applied to the corresponding canopy plus a comprehensive aluminum beam of a fixed high. External walls of old buildings double scaffolding, no matter whether the outer wall of the old buildings the new decoration, according to the length of the old buildings outside the old building eaves height multiplied by the vertical projection area, high canopy cover according to the corresponding fixed by double scaffolding Calculation of a factor of 0.5.

1984 total views, 1 today

  

Listing ID: 9354f220971939f1

Report problem

Processing your request, Please wait....