Welcome, visitor! [ Register | Login

£280.00

Other structures of the scaffolding

  • Street: shanghai
  • City: shanghai
  • County: County Antrim
  • Post Code: 200000
  • Phone Number: 86 21 67725455
  • Listed: January 27, 2012 2:25 am
  • Expires: This ad has expired

Description

1. Brick structures above or below the design height of 1.2m above the floor, the erection by the length multiplied by the height of structures calculated quantities of area, height of 3.6m or less, apply in scaffolding fixed; height of 3.6m above , apply a single row of scaffolding fixed.

2. Stone structures above or below the design field above floor height of 1.2m, according to the length multiplied by the height of structures, erection of quantities in terms of floor area, height of 3.6m or less, apply a single row of scaffolding safety net of fixed deductions; height of more than 3.6m or more, apply double scaffolding fixed.

3. Wall scaffolding, according to outdoor natural floor to the top surface of the masonry wall height of the wall multiplied by the amount of length to area calculations. Height of 3.6m or less, apply in scaffolding fixed; height of more than 3.6m above, apply the single-row fixed scaffolding.

4. Outdoor pipe scaffolding, according to the length of pipe to extend the center line of quantities in meters, the outdoor sets of scaffolding pipes fixed, height from the natural floor under the skin into the pipeline operator (multi-layer arrangement of pipes, the pipes at the top layer under the skin) .

5. Stone revetment vertical height of more than 1.2m, and the ramp area of quantities, sets of single row of scaffolding (net of safety nets) multiplied by the coefficient 0.2 scale.

6. Brick chimney outside the scaffolding to seat basis, according to the design height of the outdoor floor surface to the top of the Shaft by the chimney height; underground part of the scaffolding has been included within the fixed and can not be calculated.

7. Tower scaffolding to seat basis, height is designed outdoor floor surface to the top of the full height. Chimney with those towers, scaffolding height of the chimney height calculation by the Executive Tower scaffolding scale. Calculated only once for each water towers scaffolding costs.

8. Water (oil) tank, large equipment base, where more than or less than 1.2m above the outdoor terrace can be calculated double scaffolding. Water (oil) pool scaffolding multiplied by the length of the bottom wall of weeks to a high wall between the top edge of area calculation; large equipment base is multiplied by the circumference of scaffolding equipment form the basis of their height in terms of area.

9. Non-sliding formwork construction of reinforced concrete cvlf0rt, masonry silo, silo and a round base scaffolding, regardless of single cylinder or multi-cylinder combination, according to the design single cylinder multiplied by the circumference of the outside line of outdoor storage warehouse floor to between catchy height to space, apply double scaffolding fixed; multi-cylinder combination connected parts of the area does not buckle, scaffolding needed reinforcement bar, pole is not increased.

Jan. 11 more knowledge of scaffolding and aluminum beam description.

1514 total views, 1 today

  

Listing ID: 2904f220a9176fb3

Report problem

Processing your request, Please wait....